Work Projects:(Sent Hi-Tech Company)
7 Three phase meter for expose Ghana 1999
8 Three phase meter for Tianjin 1999
9 3 in 1 Read/Write machine 1999
10 Single phase electronic meter 2000
11 Simple multi charge meter 2000
12 Technic service and train for Ghana 2001
13 Three phase electronic meter for Tianjin 2002
14 Limited energy meter for Ghana 2002
15 Distribute energy and inspect machine (GSM/GPRS) 2003
16 All type of three phase electronic multi charge meter 2003
17 GPRS street lamp inspect communication module 2003
18 Single phase multi charge meter 2004
19 Single phase electronic meter carrier wave in power line 2004
20 High class three phase electronic pre-payment meter 2004
21 RS485 collect control system 2004
Participant Projects:(Sent Hi-Tech Company)
22 Infrared multi charge meter 2000
23 Three phase Actor-Reactor time meter 2002
24 Single phase time meter 2002
25 Logic encrypt smart card project 2003
26 GPRS three phase multi function meter 2004
27 Pre-payment money system 2004
Position Wanted:
Project Director MCU Engineer Electronic Engineer bsp;Appraisal:
I have active idea, high responsible and aggressive, working steady, stated ability
of organizing managing cooperating, careful and creative in working. Self-confidence,
self-respect, self-strive!
Application Letter:
Honorific leader:
Thanks for checking and approving my self-application letter in your valued time!
Your valuable several minutes will bring on my lucky road!
I graduated from Dalian Railway University in July 1998, learning electronic
automatic for four years and have gotten the Undergraduate Course and Bachelor's
Degree. Over the past four years of extensive electronic and computer experience
versed in both digital and analog electronics, with specific emphasis on computer
hardware and software special expertise in system and component evaluation network
supervisor responsible for installing and maintaining and designing electronic
hardware system or computer LAN system. Proficient in assembly and some C programming
languages. Excellent communication skills including written, verbal and interpersonal.
And then, I worked for six years in electronic industry. Responsible for the
下一篇:初写英文简历应需留意那些方面